The Nugegoda flyover bridge will be temporarily closed for renovations from today, the Police said.
The pre-fabricated flyover at Nugegoda was declared open in January 2009 after being constructed within a period of around three and half months.
The flyover has two lanes and is 261 metres long and 8.5 metres wide.
(Colombo Gazette)